Situation Old adhesive contained asbestos and was removed and concrete was Chemically abated. Options Shot blast or grind concrete then cap concrete with solid epoxy then apply primer to the epoxy.• Total steps: 3• Approx Cost: $5.00sf > Install S3 MRP over...
Regional Headquarters: 16 Floors

Regional Headquarters: 16 Floors

Situations New concrete containing moderate moisture including hairline cracks. The competitor’s product was already on-site and early installs involved major labor efforts. Shot blasting was required and small areas had to be hand ground, which is very...